Site solar and battery sizing calculator for WISP towers

Turn a measured site load into a first solar and battery budget. Set your outage autonomy and cloudy reserve, then compare battery chemistries without sending site data anywhere.

Calculations run in this browser. No submission, account, analytics events or remote lookup. Inputs are lost when you leave or reload.

1. Site power budget

Enter aggregate watts for each category. Include PoE losses only if they are not already in your measured total. All loads run 24 hours a day.

Each battery unit must match the selected system voltage. Count matched units in parallel; this tool does not design series wiring. Chemistry presets are editable planning assumptions: 80% LiFePO4, 50% lead-acid. Use the manufacturerโ€™s limits.

Use the worst design monthโ€™s daily irradiation in the panel plane (kWh/mยฒ/day) as equivalent full-sun hours at 1 kW/mยฒ. Find site data in Global Solar Atlas or a local solar survey; daylight hours and annual averages can undersize the array. Global Solar Atlas โ†—

Enter one combined efficiency, applied once to the energy budget. For a DC-only site, use the relevant DC converter / charging losses. Solar shading, dust, heat and battery ageing need additional design allowances.

2. Sizing estimate

Daily load energy
2.4 kWh
Daily energy including losses
2.82 kWh
Minimum nominal battery bank
295 Ah / 7.06 kWh
Whole battery units
3 ร— 100 Ah / 24 V
Installed nominal capacity
7.2 kWh
Whole panels
2 ร— 400 W
Array rating
800 W
Controller output-current estimate
42 A

For a continuous load of 100 W, the battery target covers 48 hours without solar input, including the added cloudy reserve.

The panel count replaces one dayโ€™s energy at your stated sun hours. It does not provide a guaranteed reserve-recharge time.

How the estimate works

Assume a constant 24-hour load and no solar contribution during the reserve period. Cloudy days are added to base autonomy, not substituted for it. If your autonomy already includes cloudy weather, set additional reserve to zero.

  • Daily load (Wh) = load (W) ร— 24
  • Daily supply (Wh) = daily load รท efficiency
  • Reserve (hours) = base autonomy + cloudy days ร— 24
  • Nominal battery (Wh) = load ร— reserve รท efficiency รท usable fraction
  • Battery Ah = nominal Wh รท system voltage
  • Battery units = round up (battery Ah รท unit Ah)
  • Panels = round up (daily supply รท peak sun hours รท panel W)
  • Controller output (A) = round up (installed panel W รท system V ร— 1.25)

The model applies the combined efficiency once, not once per component. Capacity is nominal; usable energy is lower. Minimum Ah is rounded upward to a whole Ah; displayed kWh is rounded to two decimal places. Counts use unrounded values.

Before buying equipment

  • The 80% LiFePO4 and 50% lead-acid discharge presets are planning assumptions, not chemistry guarantees. Adjust for the battery datasheet, cycle-life target, temperature, ageing and discharge rate.
  • The panel count balances average daily demand only. Reserve recovery needs extra solar capacity and a chosen recharge period while the site remains powered. Lead-acid absorption time and battery charge-current limits are not modeled.
  • The controller figure is a battery-side current estimate with a 25% planning margin, not a wiring or protection specification. Check actual operating voltage, cold-weather panel open-circuit voltage, short-circuit current, MPPT range and manufacturer ratings separately.
  • Battery units must each have the chosen system voltage and support parallel operation. Confirm BMS compatibility, charge settings, surge loads, cable sizing, fuses and earthing with the installer. No series string design is provided.

Solar data and equipment checks

Use local measurements and manufacturer data to refine this preliminary budget: